Construction Technology of Sliding Doors
Nov 08, 2023
Leave a message
Installation of edge strips: After the main structure is completed and accepted, check the hole size and measure the minimum of three points. Draw a+50cm position line on the door frame according to its installation elevation, in order to correct the levelness of the door frame during installation. Use a plumb bob to correct the verticality of the front and side of the frame, and use a level ruler to correct the levelness of the riser.
Installation of finished door: Install the finished door and test whether it is pushed smoothly. If the effect is not good, adjust the bottom pulley of the sliding door to make it push and pull freely.
quality standard
Main control project: The quality and performance of the sliding door should meet the design requirements. Inspection method: Check the production license, product qualification certificate, and performance testing report. The variety, type, specification, size, opening direction, installation position, and anti-corrosion treatment of sliding doors should meet the design requirements. Inspection method: observation; Ruler inspection; Check the entry acceptance records and concealed project acceptance records. The installation of the door must be secure. The quantity, location, embedding method, and connection with the frame of the embedded parts must meet the design requirements. Inspection method: observation; Hand wrench inspection; Check the acceptance records of concealed works. The accessories for pushing and pulling should be complete, correctly positioned, firmly installed, and functional to meet the requirements of usage and various performance requirements of special doors. Inspection method: observation; Hand wrench inspection; Inspect product qualification certificates, performance testing reports, and entry acceptance records